Category
Fully Automatic Horizontal Organic Heat Carrier Boiler
Boiler(heater) Applications -mainly for industrial process where high temperature is required like textile, paper, food,
Basic Info
Model NO. | YY(Q)W350~3500 |
Drum Placement | Horizontal Boiler |
Pressure | Low Pressure |
Manufacturing Level | A |
Burning Style | Chamber Combustion Boiler |
Usage | Industrial |
Thermal Output | 300000~3000000 Kcal/Hr |
Capacity | 350~3500 Kw |
Electricity | 3/380/50, 3/380/60, 3/440/60, 3/220/60 |
Coil Type | Bi Coil (Double Coil) |
Protective Cladding | Stainless |
Burner Brand | European Brand |
Medium | Thermal Oil |
Temperature Provided | 300 Deg C |
Transport Package | Stretch Film & Wooden Cases |
Specification | 350~3500 kw |
Trademark | as per |
Origin | Guangzhou |
HS Code | 84178090 |
Production Capacity | 30 Sets/Month |
Product Description
Boiler(heater) Applications-mainly for industrial process where high temperature is required like textile, paper, food, chemicals, beverage, etc
Main Product Features
-bi-coil design, safe & efficient heat conduction;
-intelligent controller with PLC and touch screen, fully automatic operation;
-well sealed boiler body & piping;
Inside View & Structure
Fully Automatic & Intelligent Control Panel with PLC, Touch Screen & Transmitters
Overview of Typical Thermal Oil Boiler (Heater) System
Technical Data & Paramters
Description | Measurement | 350 | 500 | 700 | 1000 | 1200 | 1400 | 1800 | 2000 | 2400 | 3000 | 3500 | |
Rated thermal capacity | kw | 350 | 500 | 700 | 1000 | 1200 | 1400 | 1800 | 2000 | 2400 | 3000 | 3500 | |
Design pressure | Mpa | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 | |
Max temperature | ºC | 300 | 300 | 300 | 300 | 300 | 300 | 300 | 300 | 300 | 300 | 300 | |
Oil volume in furnace | m2 | 0.254 | 0.35 | 0.507 | 0.61 | 0.83 | 0.89 | 1.2 | 1.2 | 1.35 | 2.44 | 2.52 | |
Medium circulating flow rate | m3/h | 38 | 40 | 60 | 80 | 80 | 100 | 160 | 160 | 160 | 200 | 200 | |
Pipe connection size | DN | 100 | 100 | 100 | 125 | 125 | 125 | 150 | 150 | 150 | 200 | 200 | |
Applicable fuel | light (diesel) oil/heavy oil/nautral gas/LPG/city gas | ||||||||||||
Fuel consumption | diesel oil | kg/h | 34.2 | 47.5 | 71.5 | 105 | 117.4 | 137 | 185 | 197 | 246 | 308 | 360 |
heavy oil | kg/h | 36.19 | 50.26 | 75.66 | 111.11 | 124.23 | 144.97 | 195.77 | 208.47 | 260.32 | 325.93 | 380.95 | |
natural gas | Nm3/h | 41.42 | 57 | 82.64 | 118 | 143.1 | 166.8 | 199.2 | 240.5 | 290 | 330.5 | 360 | |
Applicable electricity | 3/380/50 | ||||||||||||
Total electricity | kw | 10 | 15 | 15 | 20 | 21.5 | 25.5 | 55 | 64 | 64 | 81 | 81 | |
Max transportation weight | kg | 2196 | 2557 | 5139 | 3985 | 5138 | 5424 | 7500 | 8538 | 8900 | 11500 | 12000 | |
Max dimensions | length | mm | 2390 | 2872 | 2915 | 3315 | 3850 | 3880 | 4200 | 4500 | 4800 | 6000 | 6600 |
width | mm | 1778 | 1410 | 1778 | 2132 | 2230 | 2340 | 2470 | 2500 | 2460 | 2780 | 2780 | |
height | mm | 1634 | 1600 | 1634 | 2120 | 2220 | 2360 | 2392 | 2400 | 2355 | 2700 | 2700 | |
chimney | DN | 250 | 250 | 300 | 400 | 400 | 400 | 500 | 500 | 500 | 600 | 600 |
FAQ
Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.
Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier.
Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.
Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.
Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.
Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.
Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.
Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.