Category
Cusomized Waste Heat Steam Boilers for Heavy Fuel Oil Power Plant Horizontal Water Tube Boilers
Cusomized Waste Heat Steam Boilers for Heavy Fuel Oil Power Plant Horizontal Water Tube BoilersDescription of Waste Heat
Basic Info
Model NO. | KNFTO |
Drum Placement | Horizontal Boiler |
Pressure | Low Pressure |
Manufacturing Level | A |
Burning Style | Chamber Combustion Boiler |
Usage | Industrial, Power Station |
Transport Package | Standard Export Package |
Trademark | Kaineng |
Origin | China |
HS Code | 8402120090 |
Production Capacity | 1000 Sets /Year |
Product Description
Cusomized Waste Heat Steam Boilers for Heavy Fuel Oil Power Plant Horizontal Water Tube BoilersDescription of Waste Heat Boiler:KNLW waste heat boiler is the high efficient energy saving equipment specially designed for the waste heat recovery of the flue gas of the generator set. It is fully welded and adopts threaded tubes as reinforced heat transfer elements. The boiler has its own steam space, which can realize natural circulation and can generate saturated steam without circulating water pump. At present, thousands of waste heat boilers have been applied to various types of oil or gas-fired generating units, which have been highly praised by users.
Advantages of waste heat boiler:
1) The heat exchange efficiency is up to 98%;
2) Small size, light weight and low investment;
3) Service life is more than 20 years;
4) The structure is designed to resist vibration and noise;
5) The minimum investment payback period is 4 months;
6) Easy installation, operation and maintenance;
7) Safe, reliable operation and wide temperature range.
Product parameter (Boiler customization available):
- Operating pressure: 1.0MPa
- Design pressure: 1.1MPa
- Operating temperature(inlet/outlet) ºC ; 60/184ºC
- Design temperature 200ºC
- Hydraulic test pressure 1.4MPa
- Maximum dimension: length ×diameter 2885×Φ1525 (mm)
Kaineng Service:
Pre-sale service:
Kaineng helps customer to choose the proper exhaust gas heat recovery boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.
In-sale service:
Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.
After-sale service:
1. provide full range of original quality spare parts.
2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.
3. Our engineers will held a training for boiler workers to ensure the safe operation.
4. Free maintenance and repair for one year and lifelong service.
Kaineng Factory Area